CHAPTER 3 WATER SUPPLY SYSTEM - JICA
2007-1-10u2002·u2002Year Water Quantity (m 3 /day) Treatment Plant Capacity Day Maximum Water Demand Stage I: 100,000 m3/day Stage II: 100,000 m3/day Figure 31.1 Staged Development Plan for the Salaulim WSS 3.1.3 Availability of the Raw Water The raw water requirement for the existing WTP (which have a capacity of 160,000 m3/day) is
Get Price