CWAY Group
Three new production lines of table water will be built by the end of 2021 for the production of table water sizing 60cl, 75cl and 1.5L at the same time. The daily water treatment capacity will reach 400 tons. CWAY PH ranks top in its water treatment capacity and equipment modernization in Southeast Nigeria.
Get Price